Service station sites: assessment & remediation
Contents
Preface
Limitations
List of Acronyms
2 Assessing Former Service Station Sites
2.1 Desktop study before field work
2.2 Assessing the soil of a former service station site
2.2.1 If the location of site utilities is known
2.2.2 If the location of site utilities is not known
2.2.3 Field screening for VOCs
2.2.4 Proposed general sampling strategy
2.3 Assessing groundwater at a former service station site
2.4 Chain of custody
2.5 Threshold concentrations
2.5.1 Groundwater
2.5.2 How threshold concentrations have been selected
2.6 Chemical analysis
3 Remediating Former Service Station Sites
3.1 Hierarchy of remediation methods
3.2 Approvals
3.3 Emission controls
4 Validating Former Service Station Sites
4.1 Validating surface soils
4.2 Validating tank excavation pits
4.3 Validating excavated remediated material and imported fill
6.1 The costs of assessing a site
6.2 The costs of remediating a site
6.3 The benefits of remediating a site
Bibliography
Appendix A. Chain of Custody Form
Appendix B. Sampling and Analysis Procedures
Appendix C. Recommended Analytical Methods
This document was first published as Guidelines for Assessing Service Station Sites.
Preface
The NSW Environment Protection Authority (EPA) has prepared these guidelines for assessing and remediating service station sites in order to protect the environment and minimise the risk to public health from the future use of service station sites in NSW. This document has been prepared by the Contaminated Sites Section, Hazardous Substances Branch of the EPA in consultation with the Department of Water Resources, the Australian Institute of Petroleum and the Service Station Association.
The EPA expects these guidelines will be used by environmental consultants, local councils, real estate agents, valuers and other groups with an interest in this area.
Inquiries may be directed either to the Manager, Contaminated Sites Section, EPA, or to the Manager of your nearest EPA Regional Office.
Limitations
This document applies only to service station sites. It should be used with other relevant guidelines and information sources, including:
- Australian and New Zealand Guidelines for the Assessment and Management of Contaminated Sites (ANZECC/NHMRC 1992)
- The Health Risk Assessment and Management of Contaminated Sites (SA Health Commission 1991, 1993)
- Test Methods for Evaluating Solid Waste , Physical/Chemical Methods SW846 (US EPA 1986, 1992 revision)
- Standard Methods for the Examination of Water and Wastewater (American Public Health Association (APHA) et al. 1989).
These guidelines do not contain occupational health and safety procedures , the WorkCover Authority should be consulted regarding such requirements. Appropriate action must be taken to manage any potential hazard on-site. Site assessments should document any such incidents.
List of acronyms
ANZECC , Australian & New Zealand Environment & Conservation Council
ARMCANZ , Agricultural & Resource Management Council of Australia & New Zealand
AWRC , Australian Water Resources Council
EPA , NSW Environment Protection Authority
NHMRC , National Health & Medical Research Council
QA/QC , Quality assurance/quality control
VOC , Volatile organic compounds
1. Introduction
The Australian oil industry began to rationalise the number of service station sites in the early 1970s. At that time there were about 20,000 operating service stations in Australia, but the Service Station Association estimates that by the end of this decade there will be only 6,500 stations still in operation (Service Station Association 1992). Of the many thousands of decommissioned service station sites in NSW, there may be some with elevated concentrations of petroleum product in soil and groundwater. Because such elevated concentrations could pose an unacceptable risk to human health and the environment, a site contamination assessment may be necessary.
If a service station site is being redeveloped, the appropriate planning consent authority (e.g. the local council) may require site assessment and remediation as part of the conditions of redevelopment approval (NSW Department of Planning 1991).
2. Assessing former service station sites

Assessment of old service station sites should conform to the Australian and New Zealand Guidelines for the Assessment and Management of Contaminated Sites (ANZECC/NHMRC 1992). An approach to site assessment is discussed below. The site assessment should be documented in a detailed Site Assessment Report (see Section 5).
2.1 Desktop study before field work
Before the site assessor begins any field work on a decommissioned site, he/she should carry out a desktop study. The study may assist the site assessment by identifying potential onsite contamination, potential offsite receptors and potential routes of contaminant migration.
|
Table 1. Minimum soil sampling protocol, service station sites | |||
|
| |||
| Location | Number of Samples | Action | Analytes |
|
| |||
|
Underground storage tank (UST) pit backfill sands |
Two per tank |
Collect auger/borehole samples if tank is to remain in place, or during excavation and tank removal. Samples to be taken at or below the bottom of the tanks |
|
|
UST pit natural soils |
Two (may not be necessary if backfill sands are found to be unaffected) |
Samples between 0+200 mm into surrounding soil |
|
|
UST pit water |
One |
Sample if there is water present and backfill sands or natural soils appear contaminated. |
|
|
Pump station |
One per pump station backfill and one per natural soil (if needed) |
Sample area adjacent to line and pump junction, taking representative sample of backfill during excavation and removal of pumps; if contamination apparent, sample 0+200 mm into natural soils. |
|
|
Fuel feed lines to pumps |
One per line |
Take representative sample of backfill sands and, if it appears contaminated, sample 0+200 mm into natural soils. |
|
|
Aboveground fuel storage (drum/tank) |
One per 25 m2 |
>
Collect auger/borehole samples in areas of spills, otherwise collect samples below storage area at depth intervals of 0+200 mm and 200+500 mm. |
|
|
Belowground waste oil tank |
Two per tank |
Collect auger/borehole samples if tank is to remain in place or collect samples during excavation and tank removal. |
|
|
Spent battery storage |
One per 25 m2 |
Take representative auger samples in the 0+200 mm layer. |
|
|
Waste disposal areas (including wastewater disposal on site) |
One per 25 m2 |
Collect auger/borehole samples at the site of contamination or within the disposal area in the 0+200 mm layer. |
|
|
Imported fill |
One per 100 m3 |
Imported fill to be accompanied by certificate from supplier, otherwise collect representative augur/borehole representative samples from surface to natural ground level. |
|
|
|
|
|
|
a , total petroleum hydrocarbons: C6+C9 and C10+C36
b , benzene, toluene, ethyl benzene, xylene and total BTEX
c , polycyclic aromatic hydrocarbons
The desktop study should, where practicable, include:
- a full site identification , street address, DP and Lot Number
- the previous, current and proposed use of the site
- the previous, current and any potential future uses of all adjacent premises
- the names of past and current owner(s) of the site
- aerial and groundlevel site photographs
- the results and conclusions of any earlier site assessments
- identification and location of all tanks, lines, bowsers and filling points
- the location and a description of any imported fill
- an inventory control check
- a tank and pipeline history, outlining the age of tanks, cathodic protection, maintenance and records of any product or waste spills and leaks
- details of local geology and hydrogeology, particularly the direction, flow rate and destination of groundwater
- current and potential future use of groundwater
- the location of any underground services that could act as contaminant conduits
- a preliminary assessment of the potential consequences of product spills and leaks.
2.2 Assessing the soil of a former service station site
An assessment of the soil on the site should focus initially on the location of site utilities, e.g. filling points, tanks, feed lines, pump stations, pits and utility trenches. If this utilityfocused sampling is not possible, the site assessor should carry out volatile organic compound (VOC) field screening and soil sampling as described below. The site assessor should also record potential contamination of imported fill in the Site Assessment Report.
2.2.1 If the location of site utilities is known
If the site assessor knows the location of utilities at a site, he/she should investigate the full nature and extent of any contamination. A 'Minimum Sampling Protocol' (see Table 1) is provided to help the site assessor select sampling locations, sampling depth, sampling density and to give him/her an idea of the contaminants that may be present. If the site assessor needs to vary this protocol, he/she should record the reasons for the variations. Samples should be collected in a manner that will minimise the loss of volatiles.
In areas of the site that are not immediately associated with site utilities, the site assessor should carry out soil sampling as described below.
A typical tank installation diagram is shown in Figure 1. Sampling procedures are discussed in Appendix B.
2.2.2 If the location of site utilities is not known
If some or all of the service station equipment has been removed from the site and there are no records of the locations of former utilities, the site assessor should use the soil sampling strategy described in Section 2.2.4.
If measured analyte concentrations are above the appropriate threshold concentrations specified in Section 2.5, the site assessor may need to use a more intensive sampling strategy.
NB. A magnetometer may be used to help locate the tanks and associated pipework.
2.2.3 Field screening for VOCs
Field screening, using field photoionisation detectors (PIDs) and field flame ionisation detectors (FIDs), is used to gather information that will make the laboratory analyses more focused. Data from PIDs and FIDs provides only nonquantitative information, and needs to be supported by laboratory data.
The site assessor should also screen ambient air and soils at background locations adjacent to the site. These background screening locations should be fully documented.
For field screening, the controlled headspace method may be better than ambient soil gas measurements, so long as it is employed in a way that minimises the loss of volatiles.
PIDs and FIDs should only be operated by trained personnel. The site assessor should keep training records, instrument maintenance records and calibration records.
2.2.4 Proposed general sampling strategy
For a site area of 0.2 hectares, the site assessor should sample at least 28 evenly distributed sampling locations. This corresponds to an evenlyspaced grid of about 8.5 m. This sampling density is based on the 95% probability of finding a circular area 10 m in diameter of elevated analyte concentrations at the soil surface (Gilbert 1987).
At each sampling location, the site assessor should take soil samples at a minimum of three depths. Two of the sampling depths should be between 0+200 mm and 200+500 mm, depending on the soil stratigraphy and any apparent contamination. The third sampling depth should be below the estimated depth of the former tanks. Two samples should be taken at each depth, one for field screening and the other for laboratory analysis.
Not all duplicates may be needed for laboratory analysis. Final selection of samples should be based on site observations, site history and VOC headspace readings. The site assessor should fully document the reasons for selecting each sample.
The ratio of at least 28 locations per 0.2 hectares should be used for all sites where the location of utilities is not known. Based on site history or other evidence, the site assessor may decide to use an alternative sampling strategy, but the reasons for using the alternative strategy should be fully explained and justified in the Site Assessment Report.
The samples should be analysed for all analytes listed in Table 1, using the methods outlined in Appendix C. If imported fill is not present, analysis need not be carried out for contaminants associated with imported fill.
2.3 Assessing groundwater at a former service station site
If any groundwater is found at a site, it should be collected and submitted for laboratory analysis. The groundwater samples should be taken at the point where the saturated zone meets the unsaturated zone, or at greater depth based on field observations of contamination, using sampling procedures outlined in Appendix B.
The 'Minimum Sampling Protocol' in Table 2 should help the site assessor select sampling locations, sampling depth and sampling density, and give him/her an idea of the contaminants that may be present. If the site assessor needs to vary this protocol, he/she should record the reasons for the variations.
Where groundwater is present, the site assessor should drill at least one monitoring well on the site to assess groundwater quality. The reasons for the number and location of the well(s) should be documented.
If groundwater contamination is confirmed, then the extent of offsite migration should be assessed by drilling at least two monitoring wells down the hydraulic gradient of the tank pits and/or other potential contaminant sources, and at least one well up the hydraulic gradient as a control. During well construction, soil samples should be collected from the point where the saturated zone meets the unsaturated zone, or at greater depth based on field observations of contamination.
Any groundwater bores, including monitoring wells, must be licensed by the Department of Land and Water Conservation under Part V of the Water Act 1912. The construction of groundwater monitoring wells must not lead to contamination of underlying aquifers and aquicludes separated by impervious strata from contaminated surface material.
If the excavation and chemical testing of the tank pits and other areas of elevated contaminant concentrations shows that there has been no migration of contaminants, there may be no need to drill monitoring wells. This should be discussed in the Site Assessment Report.
Table 2. Minimum groundwater sampling protocol , service station sites
|
Location |
Minimum no. of Boreholes |
Action |
Analytes |
|
Adjacent to and down hydraulic gradient of any contamination sources on site |
One per contaminated area on site |
Collect auger/borehole soil samples and water samples from monitoring wells. The sampling depth will be dictated by the local hydro-geological conditions. |
TPH a |
|
Adjacent to site perimeter, down hydraulic gradient and offsite where possible with consent and approvals |
One per site to check for offsite migration if onsite groundwater contaminated |
|
|
|
Adjacent to site perimeter, up hydraulic gradient and off-site where possible with consent and approvals |
One per site as a control if on-site ground-water contaminated |
|
|
a , total petroleum hydrocarbons: C6+C9 and C10+C36
b , benzene, toluene, ethyl benzene, xylene and total BTEX
c , polycyclic aromatic hydrocarbons
2.4 Chain of custody
The Site Assessment Report should include a Chain of Custody (COC) form filled out by the people responsible for each stage of the sampling procedure , an example COC form is provided in Appendix A. The COC form should be completed and signed onsite by the field staff and the courier, and later by the laboratory staff.
2.5 Threshold concentrations
Threshold concentrations are included in these guidelines (see Tables 3 and 4) to assist site assessment. However, the scientific information needed to derive threshold concentrations is incomplete for some analytes, and guideline recommendations cannot be made. Threshold concentrations also have to allow for the limitations of available remediation technologies.
The Australian and New Zealand Guidelines for the Assessment and Management of Contaminated Sites state that:
The goals of contaminated site assessment and cleanup should be to:
- render a site acceptable and safe for the longterm continuation of its existing use
- minimise environmental and health risks both on- and off-site
- maximise, to the extent practicable, the potential future uses of a site (ANZECC/NHMRC 1992).
If a former service station site is earmarked for a sensitive land use, then the site should be remediated so that analyte concentrations in the soils are at or below the threshold concentrations in Tables 3 and 4, unless otherwise stated.
2.5.1 Groundwater
Groundwater quality is protected in New South Wales by the Environmental Planning and Assessment Act 1979, the Water Administration Act 1986, the Clean Waters Act 1970 and the Water Act 1912. Under those Acts it is an offence to pollute waters, including groundwaters.
The objective of the current Draft Groundwater Quality Protection Policy for New South Wales (NSW WRC 1992) is 'to protect the quality of groundwater resources of the State, to ensure that resources can support their identified uses and values in a sustainable, and economically, socially and environmentally acceptable manner'.
Contaminated aquifers and contaminated aquicludes should, as far as practicable, be remediated to the condition they were in before they became contaminated.
If groundwater is to be used for drinking water, analyte concentrations should not exceed the relevant drinking water guidelines: Guidelines for Drinking Water Quality in Australia (NHMRC/AWRC 1987), and Draft Australian Drinking Water Guidelines (NHMRC/ARMCANZ 1994). The draft NHMRC/ARMCANZ (1994) guidelines have been released for public comment, so some proposed guideline values may change upon review.
Groundwater that enters aquatic ecosystems (freshwater or marine) should not cause concentrations in the receiving ecosystem to exceed the relevant water quality guideline recommendations. See Australian Water Quality Guidelines for Fresh and Marine Waters (ANZECC 1992).
If the analyte concentrations in groundwater exceed the relevant thresholds, the groundwater should be remediated to or below the threshold concentrations. If the threshold concentrations provided are not applicable, then the EPA should be consulted to determine the remediation goals. The site assessor should keep a record of the reasons for selecting particular threshold concentrations. If other groundwater uses (e.g. industrial or agricultural) are affected, then other guideline recommendations should be considered (see ANZECC 1992).
The threshold concentrations may not apply in the following circumstances:
- when an appropriate human health risk assessment or ecological risk assessment demonstrates that lower or higher concentrations may be applicable
- when an appropriate riskbenefit analysis demonstrates that lower or higher concentrations may be acceptable.
2.5.2 How threshold concentrations have been selected
Threshold concentrations have, wherever possible, been selected from Australian sources, including ANZECC, NHMRC and ARMCANZ. In cases where the information was not available locally, Netherlands sources have been used (see Bibliography).
Threshold concentrations for soils are presented in Table 3. The concentrations have been taken from ANZECC/NHMRC (1992), and the Netherlands Ministry of Housing, Environment etc. (1994).
Threshold concentrations for waters are presented in Table 4. The concentrations have been taken from NHMRC/AWRC (1987), NHMRC/ARMCANZ (1994) and ANZECC (1992).
The threshold concentrations are based on an assessment of potential human health and ecological impacts. In some cases, the threshold concentrations may have to be lowered for aesthetic reasons. Threshold concentrations for soil and waters have not been harmonised to equilibrium conditions. Chemical equilibria may affect threshold concentrations.
2.6 Chemical analysis
The EPA recommends that laboratories use US EPA, APHA or equivalent analysis procedures for all analytes (currently recommended analytical methods are outlined in Appendix C). Practical quantitation limits (PQL, a testing threshold which is the lowest level that can be reliably determined within specified limits of precision and accuracy during routine laboratory operating conditions) and sample quantitation limits (SQL) must be consistent with threshold concentrations. A Site Assessment Report should state the PQL and SQL for each analyte.
All chemical analyses should be carried out by a laboratory that is currently accredited by NATA (or an equivalent organisation) for that particular chemical analysis. If a nonaccredited laboratory is chosen for primary assessment work, then 10% of the samples should be duplicated and submitted to an accredited laboratory for the same analysis using an accredited analytical method.
VOC losses may be considerable during field sampling and laboratory analysis. Therefore, it is essential to demonstrate data quality through a data quality assurance and data quality control (QA/QC) program. The QA/QC program should include an estimate of VOC losses.
3. REMEDIATING FORMER SERVICE STATION SITES
Remediation strategies should take into account the environmental impact of the actual remediation operations, including the impact on air quality, water quality, noise levels and waste management.
The EPA has identified the following priority environmental outcomes:
- improvement in air quality to protect public health and amenity
- improvement in inland water quality, including groundwater, in both urban and rural areas, acknowledging the value of our waterways to public health, ecosystem sustainability and economic development
- minimisation of noise in urban and rural areas
- reduced volume and toxicity of waste that requires landfill or treatment, including solid waste and hazardous substances
- improved disposal and/or recycling of waste.
Section 19 of the Clean Air Act 1961, which applies to premises not scheduled under the Act, states that the occupier of any premises shall conduct any business or activity 'in or on such premises by such practicable means as may be necessary to prevent or minimise air pollution'. Premises scheduled under this Act are bound by Section 15A which prohibits the emission of any odour from these premises. Section 16 of the Clean Waters Act 1970 prohibits unlicensed contaminated discharges to surface or groundwaters.
Separate phase products must be contained and removed from the site , the site assessor should talk to the nearest Regional Office of the EPA about disposal procedures. Any separate phase product should be fully documented in the Site Assessment Report.
3.1 Hierarchy of remediation methods
The EPA encourages the use of onsite, insitu, emission controlled and economical treatment technologies. The following preferred options, in decreasing order of preference, should be used to remediate contaminated soils at service station sites:
- onsite insitu remediation of soil and groundwater, e.g. air sparging, soil venting, and nutrient injection
Table 3. Threshold concentrations for sensitive land use: soils
|
|
|
|
|
Analytes |
Threshold concentrations a (mg/kg dry wt) |
Sources |
|
|
|
|
|
TPH b, c : C6+C9 |
65 |
see note d |
|
TPHc: C10+C40 (C10+C14, C15+C28, C29+C40) |
1,000 |
see note e |
|
Benzene |
1 f |
ANZECC/NHMRC 1992 |
|
Toluene |
1.4 g / 130 h |
Netherlands 1994 |
|
Ethyl benzene |
3.1 i / 50 j |
Netherlands 1994 |
|
Total xylenes |
14 k / 25 j |
Netherlands 1994 |
|
Phenol |
, l |
, l |
|
Total lead |
300 |
ANZECC/NHMRC 1992 |
|
Benzo(a)pyrene |
1 |
ANZECC/NHMRC 1992 |
|
Total PAHs m |
20 |
ANZECC/NHMRC 1992 |
|
|
|
|
N.B. Scientifically justified alternative threshold concentrations may be acceptable. Thresholds may be reviewed as new scientific information becomes available.
Explanatory notes for Table 3
a Refer to relevant source documents for details.
Definitions of terms used in discussion of Netherlands criteria (Denneman 1993) are:
- The maximum permissible concentration (MPC) is the 'concentration of a toxic substance that fully protects 95% of the species in an ecosystem*.
- The intervention level represents 'a level where action is needed because impermissible risks may occur. It depends on other than chemical characteristics if action should take place immediately or not*. In the case of ecological risk, the intervention level 'fully protects 50% of the species in an ecosystem*.
Further information regarding MPCs and intervention levels may be found in Denneman & vanden Berg 1993.
The Netherlands sourced values in Table 3 refer to soil with 10% natural organic matter content. These threshold concentrations must be adjusted for the particular natural organic matter content of the specific site. The natural organic matter content in soil may be determined using the Walkley and Black Method, AS 1289.D1.1+1977, Determination of the Organic Matter Content of a Soil (Standard Method).
The threshold concentrations for ethyl benzene and xylenes to protect terrestrial organisms have been derived from aquatic toxicological data using equilibrium partitioning. Investigations have shown (Van Gestal & Ma 1993) that in the case of earthworms, toxicity is related to the pore water contaminant concentration. The LC50 pore water concentrations for several compounds have been favourably compared with LC50 aquatic toxicological data for fish.
The derivations of criteria adopted as threshold concentrations have not explicitly taken account of chemical mixtures. The potential impact of mixtures of chemicals should be assessed on a sitespecific basis.
The potential for the generation of odours may mean that lower thresholds than those listed in Table 3 are required for volatile compounds.
b Total petroleum hydrocarbons
c Approximate range of petroleum hydrocarbon fractions: petrol C6+C9, kerosene C10+C18, diesel C12+C18 and lubricating oils above C18.
d The TPH C6+C9 threshold concentration, i.e. 65 mg/kg, applies to soil containing 10% natural organic matter. This concentration has been calculated assuming the following:
- that there has been a fresh spill of petrol
- that the aromatic content of the petrol is 30%
- that the resultant BTEX soils concentrations are at their lower thresholds.
TPH C6+C9 concentrations above the relevant threshold may indicate that BTEX concentrations are above their thresholds. This threshold concentration should be interpreted as only an approximate potential indicator of contamination.
e The TPH C10+C40 threshold concentration is based on a consideration both of the Netherlands Intervention Level for the TPH C10+C40 range and on commonly reported analytical detection limits. The Netherlands intervention value is 5,000 mg/kg dry weight.
f A lower benzene threshold concentration may be needed to protect groundwater.
g The toluene threshold concentration is the Netherlands MPC to protect terrestrial organisms in soil. This value was obtained by applying a US EPA assessment factor to terrestrial chronic No Observed Effect Concentration (NOEC) data. The MPC is an 'indicative* value (Van de Plassche et al. 1993; Van de Plassche & Bockting 1993).
h Human health and ecologically based protection level for toluene. The threshold concentration presented here is the Netherlands intervention value for the protection of terrestrial organisms. Other considerations such as odours and the protection of groundwater may require a lower remediation criterion.
i The ethyl benzene threshold concentration is the Netherlands MPC for the protection of terrestrial organisms in soil. No terrestrial ecotoxicological data could be found for use in the Netherlands criteria derivation. Therefore, equilibrium partitioning has been applied to the MPC for water to obtain estimates of the MPC for soil. The MPC for water has been derived from aquatic ecotoxicological data (Van de Plassche et al. 1993; Van de Plassche & Bockting 1993).
j Human health based protection level for ethyl benzene or total xylenes as shown. The threshold concentration presented here is the Netherlands intervention value. Other considerations such as odours and the protection of groundwater may require a lower remediation criterion
k The xylene threshold concentration is the Netherlands MPC for the protection of terrestrial organisms in soil. No terrestrial ecotoxicological data could be found for use in the Netherlands criteria derivation. Therefore, equilibrium partitioning has been applied to the MPC for water to obtain an estimate of the MPC for soil. The MPC for water has been derived from aquatic ecotoxicological data. The concentration shown applies to total xylenes and is based on the arithmetic average of the individual xylene MPCs (Van de Plassche et al. 1993; Van de Plassche & Bockting 1993).
l Phenol contamination is not expected to be significant at service station sites. Phenol has been included in the analyte list because it is a potential constituent of waste oil. The potential impact of phenol should be evaluated on a sitespecific basis. Phenol may have a significant impact on waters.
m Polycyclic aromatic hydrocarbons
| Table 4. Threshold concentrations: waters Threshold concentrations (1g/L)a | |||||
|
| |||||
|
|
Protection of drinking water |
Protection of aquatic ecosystemsb | |||
|
Analytes |
Health based |
Sources |
Fresh |
Marine |
Source |
|
|
|
|
|
|
|
|
TPH: C10+C36 |
, d |
, d |
, e |
, e |
, e |
|
Benzene |
10 f |
NHMRC/AWRC |
300 |
300 |
ANZECC |
|
Toluene |
800 g |
NHMRC/ARMCANZ |
300 |
, c |
ANZECC |
|
Ethyl benzene |
300 g |
NHMRC/ARMCANZ |
140 |
, c |
ANZECC |
|
Xylene |
600 g |
NHMRC/ARMCANZ |
380 h |
380 h |
Netherlands1994 |
|
Phenols |
2 |
ANZECC |
50 |
50 |
ANZECC |
|
Benzo(a)pyrene |
0.01 |
NHMRC/AWRC |
, c |
, c |
, c |
|
PAHs |
, c |
, c |
3 |
3 |
ANZECC |
|
Lead |
10 |
NHMRC/ARMCANZ |
1 + 5 i |
5 |
ANZECC |
|
|
|
|
|
|
|
N.B. Scientifically justified alternative threshold concentrations may be acceptable. Thresholds may be reviewed as new scientific information becomes available.
Explanatory notes for Table 4
a Refer to the relevant source documents for details. The unit 1g/L = micrograms per litre.
b Groundwater entering aquatic ecosystems should not cause concentrations to exceed the relevant threshold concentrations.
c Information needed to select threshold concentrations is incomplete.
d Information needed to select threshold concentrations is incomplete. Alkanes in this range have low solubility and are unlikely to be of concern in water. All separate phase products must be removed.
e Information needed to select threshold concentrations is incomplete. The NSW Clean Waters Act 1970 and Clean Waters Regulations 1972 prohibit the pollution of waters by unlicensed contaminated discharges and require licensed discharges to be visually free of oil and grease. Experience has demonstrated that the latter criterion is equivalent to an oil and grease concentration of approximately 10 mg/L.
f NHMRC/ARMCANZ 1994 proposed 1 1g/L as the new benzene guideline concentration. This has not yet been adopted.
g NHMRC/ARMCANZ 1994 proposed concentrations are similar to WHO 1993 drinkingwater quality guideline concentrations.
h Netherlands 1994 Maximum Permissible Concentration for total xylenes.
i Dependent on water hardness.
- onsite exsitu treatment and remediation of soil and groundwater, e.g. enclosed bioremediation cells and pump and treat systems with emission controls
- onsite landfarming, with enhanced bioremediation and comprehensive odour and stormwater controls, at sites where the soils are contaminated with low concentrations of volatiles or at sites remote from residential areas
- offsite controlled soil treatment
- offsite controlled remediation of soil at a licensed waste depot and subsequent use as cover material
- offsite disposal to a licensed waste depot as contaminated soil after EPA approval
- 'cap and contain' strategy with human health/ecological risk assessment to confirm remediation as appropriate.
3.2 Approvals
The site assessor may need to get approval from the Local Council before he/she begins any demolition, excavation or remediation work. The Local Council and/or the EPA can also impose odour, stormwater and/or noise control conditions on a site by issuing an Order or Notice.
Some technologies that are currently used (e.g. pump and treat techniques for groundwater contamination) may require approvals and licences from the EPA. In general, an approval may be required by the EPA under Section 19 of the Clean Waters Act if apparatus, equipment or works are to be installed, constructed or modified for the storage, treatment or discharge of pollutants to any waters.
3.3 Emission controls
If insitu treatment processes designed to prevent emissions cannot be used, then exsitu systems (e.g. enclosed bioremediation cells with exhaust gas treatment) should be used wherever practicable.
Controlled landfarming and enhanced bioremediation may be sufficient remediation for sites that are remote from residential areas or that have soils with low concentrations of volatiles, so long as all potential odour and stormwater problems are thoroughly managed.
However, if there are high concentrations of volatiles present and the soil is to be excavated, the soil may need to be vented and emissions controlled before excavation.
During any excavation operation, the site assessor should use work practices that are designed to minimise the impact of emissions , e.g. using water sprays, minimising the working face, and taking local weather conditions into account.
Using controlled landfarming and enclosed bioremediation cell techniques at landfill depots and other private facilities enables the remediated soil to be used as cover at the depot, or even as clean fill. Such operations must be carried out under the control of the EPA*s Regional Office, but they avoid the expensive practice of using waste depots as a direct means of disposing of contaminated soil.
4. VALIDATING FORMER SERVICE STATION SITES
Validation sampling and chemical analyses must be carried out to demonstrate that the site has been remediated to a standard that is suitable for the proposed land use, and is not harmful to human health or the environment. The results of a successful validation should be contained in a Validation Report.
PID and FID data are not enough to validate remediation of a site without supporting laboratory data. QA/QC procedures should be included in the validation sampling and analysis program (US EPA 1989). Judgmental sampling (i.e. sampling that does not use a systematic sampling pattern) is not appropriate for validation sampling.
A systematic sampling pattern is recommended for the validation sampling plan. The data obtained from the validation program should be statistically analysed. For a former service station site to be validated, the upper 95% confidence limit on the average site concentration for each analyte must be below the relevant threshold concentration. (The upper confidence limit is a statistically calculated concentration that provides the upper bound measurement of the average concentration of a sampling area.)
4.1 Validating surface soils
To validate the remediation of surface soils, samples should be collected on a regular 8.5 metre grid or any demonstrably similar sampling pattern. This sampling density is consistent with that specified in section 2.2 above.
4.2 Validating tank excavation pits
To validate a single tank excavation pit, one sample should be collected from the floor and one from each wall of the pit.
To validate a multiple tank excavation pit, the number of samples should be increased to give a sampling density similar to that used to validate a single tank excavation pit.
4.3 Validating excavated remediated material and imported fill
To validate remediated excavated homogeneous material, one sample per 25 m3 should be collected and analysed for site contaminants. Samples should be collected from the undisturbed bulk of the material, rather than from surface soils.
To validate imported fill, one sample per 25 m3 should be collected and analysed for the site analytes specified for imported fill, as listed in Table 1. Samples should be collected from the undisturbed bulk of the imported fill, rather than from surface soils.
5. REPORTING
The site assessor should prepare detailed reports. In some cases, the reporting process may be separated into the following stages:
- Preliminary Work Plan
- Site Assessment Report
- Draft Remedial Action Plan
- Final Report, including site validation.
The following minimum information should be provided in reports:
1 Summary
2 Table of contents
3 Complete site identification
4 Name of owner and occupier
5 Names of the people responsible for the site assessment
6 The site history and proposed future use, including previous, current and proposed land use
7 The physical characteristics of the site, including:
- geology
- hydrogeology
- topography
- background concentrations of analytes in soil and groundwater
8 Preliminary site assessment, including:
- site and background PID and/or FID measurements
- instrument calibration details
- reasons for selecting site sampling locations
- reasons for selecting background sampling locations
- description of sampling and analysis methodology
- field observations
- description of sampling equipment
- field QA/QC.
- chain of custody details
9 Chemical analyses, including:
- all results presented in tabular form
- results of analyses of blanks and spike/surrogate recoveries
- laboratory sheets presented in Appendixes
- physical units clearly specified
- reference to laboratory analytical procedures used
- analytical detection limits
- practical and sample quantitation limits (PQL and SQL)
- laboratory QA/QC
- dates of sample collection and analysis
10 Discussion of contamination assessment, including:
- detailed data evaluation
- reasons for adopting particular soil and water threshold concentrations
- clear identification of concentrations that exceed threshold concentrations
- relationship of site concentrations to background concentrations, to proposed land use, and to proposed groundwater use
- human health and/or ecological risk assessment, where appropriate
- riskbenefit analysis, where appropriate
- description of contamination sources and contaminants
- description of extent of contaminant migration
11 Imported fill, including discussion of:
- results of desktop study
- results of fieldwork
- results of sampling and chemical analysis
12 Remediation strategy(ies), including:
- remediation options
- remediation costs and benefits, where appropriate
13 Recommended remediation strategies, including:
- detailed design
- estimated duration of field operations
- approvals/licences required
- contingency for noise and odour mitigation, and stormwater runoff
- occupational health and safety plan approved by the WorkCover Authority of NSW
14 Validation Report, including:
- size of surface areas and/or volumes validated
- a plan of sample locations for each analyte
- the statistical confidence level achieved
- a statement that the remediated site is suitable for the proposed land use
15 Bibliography
16 Appendixes, including:
- maps and aerial photographs
- site photographs
- certificates of title
- details of sampling method and procedures
- borehole logs
- laboratory data
- QA/QC protocol
- certificates of clearance, e.g. for asbestos removal
- statistical justification for validation strategy
- risk assessment, where appropriate
- riskbenefit analysis, where appropriate
- licences and approvals from the EPA, where appropriate.
6. COSTS AND BENEFITS
At least 500 of the 2,000 service station sites expected to be decommissioned in Australia before the end of this decade are in NSW. The cost of assessing and remediating these sites will vary depending on sitespecific factors.
6.1 The costs of assessing a site
The current costs of site assessment, not including decommissioning costs, generally range between $3,500 and $8,000. The implementation of these guidelines will increase the minimum cost of site assessment to about $5,500 for sites without groundwater, and to about $8,000 for sites where groundwater monitoring wells need to be drilled.
These cost increases are a result of the more rigorous sampling, analysis and reporting requirements that are needed to provide a greater level of regulatory confidence in the site assessment.
6.2 The costs of remediating a site
Remediation costs range from approximately $10,000 up to, and in some cases exceeding, $200,000. However, the type and extent of contamination found at most service station sites means that remediation costs are often at the lower end of this range. Where landfarming and direct offsite disposal to a landfill are replaced by alternative technologies (incorporating suitable emission controls), costs may rise by between 25% and 60%.
6.3 The benefits of remediating a site
Increased use of emissioncontrolled onsite and offsite treatments will result in a number of environmental benefits. The treatments proposed in these guidelines will reduce the amount of VOCs, including benzene, that are emitted to the atmosphere, and thereby reduce the incidence of photochemical smog. Onsite remediation will also minimise the amount of contaminated soil that needs to be transported offsite. Both onsite and offsite controlled remediation will eliminate the need to use valuable landfill space in metropolitan areas.
There will also be a greater community confidence that soil and groundwater contamination have been detected and remediated, reducing potential public health risks and maximising potential future land and groundwater use. This increased confidence should mean that remediated sites become more valuable and attract higher land prices.
BIBLIOGRAPHY
American Public Health Association, American Water Works Association, Water Pollution Control Federation 1989. Standard Methods for the Examination of Water and Wastewater, 17th edition.
ANZECC 1992. Australian Water Quality Guidelines for Fresh and Marine Waters. Australian & New Zealand Environment & Conservation Council.
ANZECC/NHMRC 1992. Australian and New Zealand Guidelines for the Assessment and Management of Contaminated Sites. Australian & New Zealand Environment & Conservation Council and National Health & Medical Research Council.
Denneman, C. 1993. 'What is ecological risk? , Riskbased environmental quality objectives*, in Ecological Risk Assessment From Theory to Practice, Conference Proceedings, Clean Air Society of Australia and New Zealand, 1993.
Denneman C. & R. van den Berg 1993. 'Exposure assessment methods used for derivation of risk concentrations*, in Ecological Risk Assessment From Theory to Practice, Conference Proceedings, Clean Air Society of Australia and New Zealand, 1993.
Gilbert, R.O. 1987. Statistical Methods for Environmental Pollution Monitoring. Van Nostrand Reinhold, N.Y.
Netherlands Ministry of Housing, Environment etc. 1994. Environmental Quality Objectives in the Netherlands , A Review of Environmental Quality Objectives and Their Policy Framework in the Netherlands. Risk Assessment and Environmental Quality Division, Directorate for Chemicals, External Safety and Radiation Protection, Ministry of Housing, Spatial Planning and the Environment, Netherlands.
NHMRC/ARMCANZ 1994. Draft Australian Drinking Water Guidelines. National Health & Medical Research Council and Agricultural & Resource Management Council of Australia & New Zealand.
NHMRC/AWRC 1987. Guidelines for Drinking Water Quality in Australia. National Health & Medical Research Council and Australian Water Resources Council.
NSW Department of Planning 1991. Contaminated Land , Circular C20.
NSW Department of Water Resources. Practical Guide to Groundwater Sampling.
NSW WRC 1992. Draft Groundwater Quality Protection Policy for New South Wales. NSW Water Resources Council.
SA Health Commission 1991, 1993. The Health Risk Assessment and Management of Contaminated Sites, Proceedings of the First and Second National Workshops on the Health Risk Assessment and Management of Contaminated Sites. South Australian Health Commission, 1991 and 1993 respectively.
Service Station Association 1992. '598 Sites Closed *, in Service Station, February 1992.
US EPA 1986. Test Methods for Evaluating Solid Waste , Physical/Chemical Methods SW+846 , 3rd edition (revised July 1992). Office of Solid Waste and Emergency Response, United States Environmental Protection Agency.
US EPA 1989. Methods for Evaluating the Attainment of Cleanup Standards (EPA 230/02+89+042). Office of Policy, Planning and Evaluation, United States Environmental Protection Agency.
Van de Plassche, E.J. & G.J.M. Bockting, 1993. Towards Integrated Environmental Quality Objectives for Several Volatile Compounds. National Institute of Public Health and Environmental Protection, Bilthoven, The Netherlands, Report No. 679101 011, 1993.
Van de Plassche, E.J., M.D. Polder & J.H. Canton 1993. Derivation of Maximum Permissible Concentrations for Several Volatile Compounds for Water and Soil. National Institute of Public Health and Environmental Protection, Bilthoven, The Netherlands, Report No. 679101 008, 1993.
Van Gestal, C.A.M. & W. Ma 1993. 'Development of QSARs in soil ecotoxicology: earthworm toxicity and soil sorption of chlorophenols, chlorobenzenes and chloroanilines*, in Water, Air and Soil Pollution 69: pp. 265+276, 1993.
APPENDIX A. CHAIN OF CUSTODY FORM

APPENDIX B. SAMPLING AND ANALYSIS PROCEDURES
1 General
Laboratoryprepared sample jars should be used to collect samples. These are available from analytical laboratories upon request. All samples should be collected quickly to minimise the loss of volatile and semivolatile compounds.
When collecting samples, the site assessor should make one member of the sampling team responsible for all documentation , e.g. labelling and borehole logs , and the other members should collect samples. The site assessor should also ensure that there is no crosscontamination between sampling events. Once taken, the samples should immediately be sealed and labelled with the following:
- the name of the person who collected the sample
- the date, time and place the sample was collected
- the weather conditions at the time of collection
- an identification of the sample.
All sample containers should then immediately be placed in a plastic bag in a cooler/esky below 4/C, taking care to ensure that melted ice does not cause the sample containers to become submerged.
All sampling equipment must be decontaminated before and between sampling events , the EPA recommends a phosphatefree detergent solution, followed by a tap water rinse and a final rinse with distilled water. Heavy equipment, such as drilling rigs and backhoes, should be thoroughly steamcleaned or waterblasted before they arrive on-site, and again between each sampling event. The site assessor should ensure that the decontamination process does not itself pollute waters or further pollute the land.
2. Soil samples
Refer to US EPA (1986).
2.1 Lead
Samples should be collected in laboratoryprepared polyethylene or glass bottles.
2.2 Volatile organic compounds , C6 to C9 fraction & BTEX
Samples should be collected in laboratoryprepared VOC vials. VOC samples should be taken on an individual rather than a composite basis. All samples should be taken in a manner that minimises VOC losses. The samples should be sealed immediately with zero headspace. The site assessment should quantify VOC losses.
2.3 Nonvolatiles & semivolatiles , C10 to C36 fractions, PAHs & phenol
Samples should be collected in widemouthed laboratoryprepared jars. If compositing these samples, stainless steel equipment should be used.
3 Surface water
Refer to American Public Health Association et al. (1989).
Samples should be collected in narrowmouthed laboratoryprepared sample jars. The jars should be rinsed three times with the sample water before the final sample is taken for analysis.
3.1 VOCs
Samples should be acidified with hydrochloric acid to pH 2 and sealed with zero headspace.
3.2 Metals
Samples should be filtered (0.451m) before being sealed in a polyethylene container. Samples for lead analysis should be preserved by acidifying the sample to pH 2 with nitric acid.
4 Groundwater
The installation of groundwater monitoring wells and sampling of groundwater should be undertaken by suitably qualified personnel using currently acceptable practices. Refer to NSW Department of Water Resources (1992).
5 Field QA/QC
A QA/QC plan should be implemented to ensure a high standard of work when undertaking the site assessment. The QA/QC plan should include as a minimum:
- 10% duplicate sampling of field samples
- Preparation of rinsate blanks to determine if field sample preparation apparatus were cleaned properly. The rinsate should be analysed. Each batch of samples should contain one preparation rinsate blank.
- Trip blanks to detect any cross contamination during transport.
- Laboratoryprepared spiked VOC samples. These samples should be stored, handled and transported in exactly the same way as the field samples.
APPENDIX C. RECOMMENDED ANALYTICAL METHODS
ANALYTICAL PROCEDURE
|
ANALYTICAL PROCEDURE | ||||
|
Analytes |
Water |
Soil | ||
|
|
Extraction |
Detection |
Extraction |
Detection |
|
TPH |
418.1 a |
or 8000 GC/FID |
3550 c sonication a |
or 8000 GC/FID |
|
BTEX |
5030 purge & trap 3810 d |
602 GC/PID/FID/MS 8020 GC/PID/FID/MS |
5030 purge & trap 3810 d |
8020 GC/PID/FID/MS 8020 GC/PID/FID/MS |
|
PAHs |
3510 liquid/liquid dichloromethane |
8270 GCMS |
3550 sonication dichloromethane |
8270 GCMS |
|
Phenolic Compounds |
3510 liquid/liquid acidified dichloromethane |
8270 GCMS |
3550 sonication dichloromethane |
8270 GCMS |
|
Lead |
3005 acid digestion |
6010 - ICP/AES 200.8 - ICP/MS 7420 -AAS flame or 7421 furnace 3111B - APHA or 3113B - APHA |
3050 acid digestion |
6010 - ICP/AES 200.8 - ICP/MS 7420 -AAS flame or 7421 furnace 3111B - APHA or 3113B - APHA |
a Production of fluorocarbon 113, the preferred solvent, will cease at the end of 1995. Alternatives to fluorocarbon 113 could be nhexane; 80% hexane, 20% methyltertbutylether; cyclohexane; perchlorethylene; or supercritical fluid extraction. The site assessor should produce evidence that demonstrates that the solvent used is suitable.
b Selection of detection method should be based on the contaminants of concern, whether distillates or motor oils.
Where there is some interference with FID, a more selective detector such as MS should be used.
c Samples should not be heated or volatile compounds will be lost.
d This is a screening method only. Further quantitative testing is necessary.
NB. If alternative methods are used, the site assessor should produce evidence that demonstrates that the selected method performs as well as those recommended.
Where fill of an unknown origin is detected on-site, the US EPA, APHA or Australian Standard Methods should be used for the analysis of the contaminants listed in Table 1 (imported fill).