Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Arakoon NP | Retail Lease – Trial Bay Kiosk | Adrian Molnar & Nikol Uhrova | 26/08/2019 – 25/08/2024 | 31/08/2029 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Bargo SCA | Telco Other Lic - Hilltop NSWTA | NSW Govt Telco Authority | 01/03/2019 - 29/02/2024 | 28/02/2039 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Ben Boyd NP | Comm. Lease - Green Cape Weather Station | Bureau Of Meteorology | 01/07/1997 - 30/06/2022 | 30/06/2047 |
Ben Boyd NP | Easement - EA ROW - Ben Boyd | Private | 22/10/2009 - Terminable at Will | |
Ben Boyd NP | Easement - SL South East Fibre - Ben Boyd | South East Fibre Exports Pty Ltd | 01/11/2011 - Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Bendick Murrell NP | Access Licence - AC Mt Crowther | Optus Mobile Pty Limited | 01/08/2011 - 31/07/2016 | Holdover |
Bendick Murrell NP | Access Licence - AC Mt Crowther | Telstra Corporation Limited | 01/06/2011 - 31/05/2021 | 31/05/2031 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Bents Basin SCA | Easement - TL Bents Basin | Endeavour Energy | 21/11/1980 - Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Berowra Valley RP | Telco Cable Lic - CL NBN Co Ltd | National Broadband Network Co Ltd | 01/05/2017 - 30/04/2022 | 30/04/2037 |
Berowra Valley RP | Telco Other Lic - CMUX -Telstra Berowra | Telstra Corporation Limited | 01/12/2006 - 30/11/2021 | 30/11/2026 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Biamanga NP | Telco Lic-CU ATI Telecom | ATI Telecom Pty Ltd | 01/07/2009 - 30/06/2019 | Holdover |
Biamanga NP | Telco Lic-CU Bega Valley SC - Rural Fire Serv | Bega Valley Shire Council on behalf NSW Rural Fire Services | 01/01/2017 - 31/12/2021 | 31/12/2026 |
Biamanga NP | Telco Lic-CU Bega Valley Shire Council | Bega Valley Shire Council | 01/01/2017 - 31/12/2021 | 31/12/2026 |
Biamanga NP | Telco Lic-CU NSW Govt Tel Authority | NSW Govt Telco Authority | 01/07/2009 - 30/06/2019 | Holdover |
Biamanga NP | Telco Lic-PU NSW Police | NSW Police Force | 01/07/2007 - 30/06/2017 | Holdover |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Blue Gum Hills RP | Comm. Lease - Treetop Adventure Park | Treetop Adventures Holdings Pty Ltd | 01/01/2010 – 31/03/2025 | 31/03/2025 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Blue Mountains NP | Easement - SL Sydney Water - Medlow Bath | Sydney Water Corporation | 01/10/2006 - Terminable at Will | |
Blue Mountains NP | Easement - TL Electricity Medlow Bath | Endeavour Energy | 30/07/2007 - Terminable at Will | |
Blue Mountains NP | Retail Lease - Conservation Hut Cafe | The Conservation Hut Cafe Pty Ltd | 13/01/2018 - 12/01/2023 | 12/01/2028 |
Blue Mountains NP | Telco Lic-CU Optus | Optus Mobile Pty Limited | 01/07/2010 - 30/06/2023 | 30/06/2028 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Booti Booti NP | Easement - SL Water Main Line - Lakes Way | Midcoast Water | 18/09/2001 - Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Border Ranges NP | Access Licence - AC Gradys Creek Rd | Australian Rail Track Corp'n Ltd | 01/11/2011 - 31/10/2017 | Holdover |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Bouddi NP | Easement - EA Sewerline to Killcare | Central Coast Council | 17/05/1993 - Terminable at Will | |
Bouddi NP | Easement - EA Sewerline to MacMasters Beach | Central Coast Council | 07/11/1991 - Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Bournda NP | Telco Cable Lic - CL Bournda NP - Fibre Optic | Dept Of Education & Communities | 01/11/2011 - 31/10/2021 | 31/10/2031 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Bretti NR | Telco Cable Lic - CL Thunderbolts Way-Bretti NR | Telstra Corporation Limited | 01/01/2013 - 31/12/2022 | 31/12/2032 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Brisbane Water NP | Comm. Lease – Kariong Fire Control Centre | Central Coast Council | 01/11/1995 – 31/10/2020 | 31/10/2020 |
Brisbane Water NP | Easement – EL Ettalong – Snake Gully | Ausgrid | 19/06/1986 – Terminable at Will | |
Brisbane Water NP | Easement – EL Woy Woy Bay Road | Private | 24/05/2013 – Terminable at Will | |
Brisbane Water NP | Easement – PLW Power Koolewong | Central Coast Council | 01/07/1983 – Terminable at Will | |
Brisbane Water NP | Easement – SL Kariong Water Supply | Central Coast Council | 20/10/1976 – Terminable at Will | |
Brisbane Water NP | Easement – SL Water Koolewong | Central Coast Council | 20/10/1995 – Terminable at Will | |
Brisbane Water NP | Easement – SW Drain-Pt Clare | Central Coast Council | 24/03/1994 – Terminable at Will | |
Brisbane Water NP | Easement – TL Girrakool Park | Ausgrid | 14/02/1989 – Terminable at Will | |
Brisbane Water NP | Easement – TL Kariong to Woy Woy Bay | Ausgrid | 19/06/1986 – Terminable at Will | |
Brisbane Water NP | Easement – TL Patonga to Umina & Pearl | Ausgrid | 06/08/1992 – Terminable at Will | |
Brisbane Water NP | Easement – TL Peats Ridge | Ausgrid | 25/10/1982 – Terminable at Will | |
Brisbane Water NP | Telco Access Lc – AC Koolewong Reservoir | Axicom Pty Ltd (CCA) | 01/01/2004 – 31/12/2018 | Holdover |
Brisbane Water NP | Telco Access Lc – AC Koolewong Reservoir | Optus Mobile Pty Limited | 01/01/2015 – 31/12/2019 | Holdover |
Brisbane Water NP | Telco Access Lc – AC Koolewong Reservoir | Telstra Corporation Limited | 01/01/2009 – 31/12/2018 | Holdover |
Brisbane Water NP | Telco Access Lc – AC Koolewong Reservoir | Vertical Telecoms Pty Ltd | 20/02/2009 – 19/02/2019 | Holdover |
Brisbane Water NP | Telco Access Lc – AC Koolewong Reservoir | Vodafone | 01/01/2009 – 31/12/2018 | Holdover |
Brisbane Water NP | Telco Cable Lic – CL Brisbane Water NP | Telstra Corporation Limited | 01/05/2012 – 30/04/2022 | 30/04/2032 |
Brisbane Water NP | Telco Cable Lic – CL Brisbane Water NP – Pearl Beach | National Broadband Network Co Ltd | 01/07/2015 – 30/06/2025 | 30/06/2035 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Brunswick Heads NR | Easement - EA Brunswick | Byron Shire Council | 11/11/1993 - Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Bundjalung NP | Easement - TL Power Lines | Essential Energy DST Queanbeyan | 26/09/2004 - Terminable at Will | |
Bundjalung NP | Telco Cable Lic - CL Bundjalung NP - Telecoms Cable | Telstra Corporation Limited | 01/08/2005 - 31/07/2020 | Holdover |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Burragorang SCA | Easement - TL Electricity near Ridge Road, The Bridge | Endeavour Energy Property Services | 01/07/1996 - Terminable at Will | |
Burragorang SCA | Telco Cable Lic - CL Burragorang NP - Burragorang Rd | Telstra Corporation Limited | 01/08/2006 - 31/07/2021 | 31/07/2026 |
Burragorang SCA | Telco Cable Lic - CL Burragorang NP - Ridge Rd Oakdale | Telstra Corporation Limited | 01/09/2007 - 31/08/2022 | 31/08/2027 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Cape Byron SCA | Comm. Lease – Lease Weather Station-Wombat Creek | >Bureau of Meteorology | 08/10/1998 – 30/06/2022 | 30/06/2047 |
Cape Byron SCA | Comm. Lease – Lighthouse 2/847753 | Australian Maritime Safety Authority | 08/10/1998 – 30/06/2022 | 30/06/2047 |
Cape Byron SCA | Comm. Lease – Lighthouse Surrounds 1/847753 | Australian Maritime Safety Authority | 08/10/1998 – 30/06/2022 | 30/06/2047 |
Cape Byron SCA | Easement – EL Cape Byron | Essential Energy DST Queanbeyan | 01/01/2008 – Terminable at Will | |
Cape Byron SCA | Easement – PLW Drainage/Slope Stabilisation | Byron Shire Council | 05/07/2011 – Terminable at Will | |
Cape Byron SCA | Retail Lease – Cape Byron Lighthouse Cafe | Cape Byron Lighthouse Cafe Pty Ltd | 07/07/2016 – 06/07/2021 | 06/07/2021 |
Cape Byron SCA | Retail Lease – The Pass Cafe | Dean Thomas Gibson Kylie Anne Fitzpatrick | 05/09/2016 – 04/09/2021 | 04/09/2021 |
Cape Byron SCA | Telco Cable Lic – CL Cape Byron SCA – Optus | Optus Fixed Infrastructure Pty Ltd | 01/07/2010 – 30/06/2020 | Holdover |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Coffs Coast RP | Easement - EA SL Sandy Beach | Coffs Harbour City Council | 01/02/2005 - Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Conjola NP | Easement - PLW Berrara-Nth Bendalong | Shoalhaven City Council | 20/05/2019 - Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Crowdy Bay NP | Easement - SL Midcoast Water | Midcoast Water | 13/09/1991 - Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Cullendulla Creek NR | Easement – EL Long Beach DP 2/882116 | Essential Energy DST Queanbeyan | 05/04/2019 – Terminable at Will | |
Cullendulla Creek NR | Easement – EL Long Beach DP 7006/1029234 | Essential Energy DST Queanbeyan | 05/04/2019 – Terminable at Will/td> |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Cuumbeun NR | Easement – PLG Yarrowlumla Gas Pipeline | Jemena Networks (ACT) Pty Ltd & ICON Distribution Investments Limited | 02/02/2010 – Terminable at Will | |
Cuumbeun NR | Telco Cable Lic – CL Cuumbeun NR – Uground Fibre Optic | Praeco Pty Ltd | 29/10/2007 – 28/10/2017 | Holdover |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Dharawal SCA | Telco Cable Lic - CL Dharawal SCA - Optical Fibre | Telstra Corporation Limited | 01/12/2009 - 30/11/2019 | Holdover |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Dorrigo NP | Retail Lease - Canopy Cafe | John G Doyle, Suzanne M Doyle & Justin T Gilbert | 01/04/2019 - 31/03/2024 | 31/03/2029 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Dunggir NP | Telco Lic-PU Nambucca SC | Nambucca Shire Council | 01/01/1997 - 31/12/2013 | Holdover |
Dunggir NP | Telco Lic-PU Vertel BWSGR | Vertical Telecoms Pty Ltd | 01/07/2007 - 30/06/2017 | Holdover |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Eurobodalla NP | Comm. Lease – Beachcomber Holiday Park | Valaze Group Pty Ltd | 06/08/2015 – 31/08/2027 | 31/08/2037 |
Eurobodalla NP | Resident. Lease – Old Pilot Station | Private | 01/01/2006 – 31/12/2021 | 31/12/2021 |
Eurobodalla NP | Telco Cable Lic – CL Eurobodalla NP – Bodalla to Potato Point | Telstra Corporation Limited | 11/03/2008 – 10/03/2023 | 10/03/2028 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Garigal NP | Easement – TL Cannons Pde, Forestville | Ausgrid | 19/06/1986 – Terminable at Will | |
Garigal NP | Easement – TL Roseville Bridge Picnic | Ausgrid | 19/06/1986 – Terminable at Will | |
Garigal NP | Easement – TL Starkey St, Killarney Hts | Ausgrid | 19/06/1986 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Georges River NP | Easement – EA Electricity – Picnic Point | TransGrid | 03/09/2002 – Terminable at Will | |
Georges River NP | Easement – EA Stormwater | Bankstown City Council | 01/07/2004 – Terminable at Will | |
Georges River NP | Easement – SL – Sylvan Ridge Drive | Sydney Water Corporation | 31/07/1984 – Terminable at Will | |
Georges River NP | Easement – SL Illawong & Alfords Pt | Sydney Water Corporation | 28/08/1984 – Terminable at Will | |
Georges River NP | Easement – SL Sewer pump – Padstow Heights | Sydney Water Corporation | 20/07/1983 – Terminable at Will | |
Georges River NP | Easement – TL Busaco Road | Ausgrid | 24/12/1982 – Terminable at Will | |
Georges River NP | Easement – TL Picnic Point | Ausgrid | 20/07/1982 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Ghin-Doo-Ee NP | Telco Lic-CU – PU Great Lakes FM | NSW Govt Telco Authority | 01/05/2019 – 30/04/2024 | 30/04/2039 |
Ghin-Doo-Ee NP | Telco Lic-CU Countrytell | Murray River Regional Telecommunications t/a Countrytell | 01/07/2013 – 30/06/2018 | Holdover |
Ghin-Doo-Ee NP | Telco Lic-CU Optus | Optus Mobile Pty Limited |
01/07/2017 – 30/06/2022 | 30/06/2037 |
Ghin-Doo-Ee NP | Telco Lic-PU Great Lakes FM | Great Lakes Area FM Com Radio Association Incorporated | 01/07/2013 – 30/06/2018 | Holdover |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Gir-um-bit SCA | Easement - EL Electricity | Ausgrid | 20/09/2012 - Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Glenrock SCA | Easement - EA Sewer Glenrock SRA | Hunter Water Corporation | 06/12/1991 - Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start – End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Goobang NP | Telco Cable Lic – CL Goobang NP – Parkes / Manildra | Soul Pattinson Telecommunications Pty Ltd | 17/04/2007 – 16/04/2022 | 16/04/2027 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Goonengerry NP | Easement - EA Coopers Creek | Private | 06/06/2011 - Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Goulburn River NP | Easement - EA Mt Piper | Transgrid | 03/05/1984 - Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Hartley HS | Retail Lease - Hartley - Post Office Cafe | Susan & Nic Alexander | 01/03/2014 - 01/03/2024 | 01/03/2024 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Hat Head NP | Comm. Lease – Lighthouse 1/847754 | Australian Maritime Safety Authority | 01/07/1997 – 30/06/2047 | 30/06/2047 |
Hat Head NP | Comm. Lease – Lighthouse surrounds 2/847754 | Australian Maritime Safety Authority | 01/07/1997 – 30/06/2047 | 30/06/2047 |
Hat Head NP | Comm. Lease – Smoky Cape Bed & Breakfast | Smoky Cape Lighthouse Cottages Pty Ltd | 01/02/2020 – 31/01/2025 | 31/01/2030 |
Hat Head NP | Comm. Lease – Smoky Cape Weather Station | Bureau of Meteorology | 01/07/1997 – 30/06/2047 | 30/06/2047 |
Hat Head NP | Easement – PLW Kempsey City Council – McGuires Crossing Borefields | Kempsey Shire Council | 26/05/1988 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Heathcote NP | Easement – SL Sydney Water Corp | Sydney Water Corporation |
01/07/1983 – Terminable at Will | |
Heathcote NP | Telco Cable Lic – CL AARNET Heathcote NP Garrawarra SCA | AARTNET Pty Ltd | 01/02/2020 – 31/01/2025 | 31/01/2040 |
Heathcote NP | Telco Lic-PU – MISC Air Services | Airservices Australia Property Branch | 01/07/2006 – 30/06/2018 | Holdover |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Hill End HS | Comm. Lease – Haefligers Cottage | Bathurst Regional Council | 01/02/2011 – 31/01/2021 | 31/01/2021 |
Hill End HS | Comm. Lease – Murrays Cottage | Bathurst Regional Council | 01/02/2011 – 31/01/2021 | 31/01/2021 |
Hill End HS | Comm. Lease – Royal Hotel | Stephen Burgess | 01/04/2007 – 31/03/2027 | 31/03/2027 |
Hill End HS | Resident. Lease – Ackermann Cottage | Private | 01/05/2007 – 30/04/2027 | 30/04/2047 |
Hill End HS | Resident. Lease – Athol Cottage | Private | 26/12/2016 – 25/12/2037 | 25/12/2037 |
Hill End HS | Resident. Lease – Carver's Cottage | Private | 23/12/2008 – 31/12/2012 | Holdover |
Hill End HS | Resident. Lease – Denningtons Cottage | Private | 01/05/2007 – 30/04/2027 | 30/04/2047 |
Hill End HS | Resident. Lease – English Cottage | Private | 01/05/2007 – 30/04/2027 | 30/04/2047 |
Hill End HS | Resident. Lease – Heaps Cottage | Private | 01/06/2018 – Terminable at Will | |
Hill End HS | Resident. Lease – Hockings Cottage | Private | 01/07/2003 – Terminable at Will | |
Hill End HS | Resident. Lease – Rose Cottage | Private | 01/06/2018 - 31/12/2021 | 31/12/2021 |
Hill End HS | Resident. Lease – Smythes Cottage | Private | 16/12/2016 – 15/12/2037 | 15/12/2037 |
Hill End HS | Resident. Lease – Warry's Cottage | Private | 01/05/2007 – 30/04/2027 | 30/04/2047 |
Hill End HS | Resident. Lease – Woolard's Cottage | Private | 01/08/2013 – Terminable at Will | |
Hill End HS | Retail Lease – General Store | Christopher Grosset & Jean Littlewood | 08/04/2019 – 07/04/2024 | 07/04/2029 |
Hill End HS | Retail Lease – Northeys Store | James & Gaye Shanahan | 01/01/2014 – 31/12/2023 | 31/12/2023 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Hunter Wetlands NP | Easement – PLW Discharge Water | Australian Flourine Chemicals | 15/09/1986 – Terminable at Will | |
Hunter Wetlands NP | Easement – TL Williamtown 3rd Feeder | Ausgrid | 11/01/2012 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Illawarra Escarpment SCA | Easement – EA ROW Lot 1 DP 618764 | Illawarra Clay Target Club | 05/02/2008 – Terminable at Will | |
Illawarra Escarpment SCA | Telco Cable Lic – CL Illawarra Escarpment SCA – FibreOptic | Telstra Corporation Limited | 01/10/2008 – 30/09/2023 | 30/09/2028 |
Illawarra Escarpment SCA | Telco Cable Lic – CL Illawarra Escarpment SCA – Mt Keira | Telstra Corporation Limited | 25/09/2006 – 24/09/2021 | 24/09/2026 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Iluka NR | Easement – PLW Water Pipeline | Dept. of Finance and Services NSW | 31/07/1986 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Indwarra NP | Easement – EA Mt Tingha Electricity | Essential Energy DST Queanbeyan | 18/02/2004 – Terminable at Will | |
Indwarra NP | Telco Access Lc – AC Mt Tingha | National Broadband Network Co Ltd | 27/06/2014 – 26/06/2024 | 30/06/2034 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Jerrawangala NP | Telco Lic-PU NSW Police | NSW Police Force | 01/01/2014 – 31/12/2019 | Holdover |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Kamay-Botany Bay NP | Comm. Lease – Cape Baily Lighthouse | Australian Maritime Safety Authority | 01/07/1997 – 30/06/2047 | 30/06/2047 |
Kamay-Botany Bay NP | Comm. Lease – La Perouse Museum | Randwick City Council | 26/10/2017 – 25/10/2038 | 31/10/2059 |
Kamay-Botany Bay NP | Easement – EA ROW | Landcom | 18/03/2006 - Terminable at Will | |
Kamay-Botany Bay NP | Easement – EL 132kV Electricity Easement | Ausgrid | 01/08/2008 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Kanangra-Boyd NP | Easement – TL Nr Mount Edwards | Essential Energy DST Queanbeyan | 07/10/1983 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Karuah NP | Easement – EA ROW Limeburners Creek | Private | 22/09/2015 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Khappinghat NR | Easement – PLW Old Bar Taree | MidCoast Council | 21/07/2017 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Kosciuszko NP | Comm. Lease – Alexandra Ski Club | Alexandra Ski Club Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – All Denominational Church | All Denominational Church | 01/01/1968 – 31/12/2067 | 31/12/2067 |
Kosciuszko NP | Comm. Lease – Alpenhof Lodge | Kosciusko Alpine Club Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Altitude – The Lodge Smiggins | Snow Accommodation Pty Ltd | 01/07/2014 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Apex Chalet | Apex Foundation | 01/10/2019 – 30/09/2034 | 30/09/2034 |
Kosciuszko NP | Comm. Lease – Aurora Ski Club | Aurora Ski Club Co-operative Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Aust Golf Club Ski Lodge | Australian Golf Club Ski Lodge Co-operative Limited | 01/07/2014 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Australian Ski Club | Australian Ski Club Co-Op Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Avalanche Alpine Club | Avalanche Alpine Club Co-operative | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Barina Milpara Lodge | Barina Milpara Lodge Limited Treasurer | 01/07/2014 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Barrakee Ski Lodge | Ella Snow Pty Ltd | 01/12/1984 – 30/11/2033 | 30/11/2033 |
Kosciuszko NP | Comm. Lease – Beachcombers Alpine Retreat | Beachcombers Alpine Retreat Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Blue Cow Ski Club | Blue Cow Ski Club Incorporated | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Boonoona Lodge | City Tattersalls Club | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Caloola Ski Club | Caloola Ski Club Co Operative Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Canberra Alpine Club | Canberra Alpine Club Incorporated | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Catholic Church | Catholic Church | 01/02/1964 – 31/01/2063 | 31/01/2063 |
Kosciuszko NP | Comm. Lease – Charlotte Pass Village | Charlotte Pass Snow Resort Pty Ltd | 01/05/2018 – 31/10/2058 | 31/10/2058 |
Kosciuszko NP | Comm. Lease – Chez Jean Apartments | Chez Jean Apartments Pty Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Christina Ski Club | Christina Ski Club Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Clancy Alpine | Clancy Alpine Club Co-Op Society Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Consolidated Mountain Lease | Perisher Blue Pty Ltd | 01/07/2008 – 30/06/2048 | 30/06/2068 |
Kosciuszko NP | Comm. Lease – Cooma Ski Club | Cooma Ski Club Lodge Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Corroboree Lodge | Banna Pty Limited t/as Notre Unit Trust | 05/02/2014 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Cowra Ski Club | Cowra Ski Club Co-operative Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Cronulla Ski Club | Cronulla Alpine Lodge Co-operative | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – CSIRO Ski Club | CSIRO Ski Club Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Dianella Ski Club | Dianella Ski Club Co-op Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Doorak Lodge (Snowy River Ski Club) | Snowy River Ski Club Co-op Limited | 01/01/2013 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Dulmison Ski Club | Dulmison Ski Club Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Edelweiss Ski Club | Edelweiss Ski Club Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Eiger Chalet | Luhajo Pty Ltd | 01/10/2012 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Eremo Ski Club Lodge | Eremo Ski Lodge | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Fjellheim Ski Lodge | Fjellheim Ski Lodge Co-op Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Friday Flat | Roads and Maritime Services | 01/07/2012 – 30/06/2037 | 30/06/2047 |
Kosciuszko NP | Comm. Lease – Geebung Ski Club | Geebung Ski Club Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Gunuma Lodge | Gunuma Lodge Incorporated | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Gunyah Ski Club | Gunyah Ski Club Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Guthega Alpine Hotel | Kaiwarra Pty Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Guthega Ski Club | Guthega Ski Club Incorporated | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Heidi's Lodge & Bistro | Heidi's Chalet Apartments Pty Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Highway Alpine Club | Highway Alpine Club Co-op Ltd | 01/07/2014 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Hus-Ski Lodge | Hus-ski Lodge Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Illabunda Lodge | Port Kembla Ski Club Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Illawarra Alpine Club Lodge | Illawarra Alpine Club Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Illoura Lodge | Illoura Lodge Ski Club Pty Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – IMBAC Lodge | IMBAC Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Jagungal Lodge | ACTP Ski Club Incorporated | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Kahane Lodge | Southern Alps Ski Club Lodge Co-Operative Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Kalymaro Lodge | Kalymaro Lodge (Co-op) Ltd | 01/07/2014 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Kandahar Ski Club | Kandahar Ski Club Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Karralika Ski club | Karralika Ski Club Co-op Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Kiandra Pioneer Ski Club | Kiandra Pioneer Ski Club (1861) Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Kooloora Lodge | Mount Pritchard & Dist. Community Club | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Kosciuszko Tourist Park | Kosipark Pty Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Kunapipi Ski Club | Kunapipi Ski Club Co-operative Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Ku-ring-gai Alpine Lodge | Ku-ring-gai Alpine Lodge Co-op Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Kyilla Lodge | Brindabella Ski Club Inc Public Officer | 01/07/2014 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Lampada Ski Club | Lampada Ski Club Co-operative | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Langlauf Ski Club | Langlauf Ski Club Co-operative Society Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Lions Lair | Jade Holdings Pty Ltd Trustee for the Jade Trust | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Lodge 21 | Ski Lodge 21 Pty Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Lodge 39 | DJ & CR Pryke | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Man from Snowy River Hotel | The Man at Perisher Hotel Pty Ltd | 25/04/1978 – 24/04/2023 | 24/04/2023 |
Kosciuszko NP | Comm. Lease – Maranatha Lodge | The Thirroul Ski Club Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Marritz Hotel | HD Diesels Pty Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Matterhorn Ski Lodge | Gornergrat Pty Ltd as Trustee for the Gornergrat Trust | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Mawabu Ski Club | Manly-Warringah Master Builders Ski Club Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Merriment Alpine Club | Merriment Alpine Club Co-operative | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Mirrabooka Ski Club | Mirrabooka Co-operative Ski Club | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Moerlina Lodge | Fellowship Ski Club (Co-op) Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Mt Selwyn RMS Depot | Roads and Maritime Services | 01/07/2012 – 30/06/2037 | 30/06/2047 |
Kosciuszko NP | Comm. Lease – Mt Selwyn Snowfields | Selwyn Snow Resort Pty Ltd | 07/05/1984 – 30/06/2028 | 30/06/2028 |
Kosciuszko NP | Comm. Lease – Mulubinba Lodge | Shortland Alpine Club Co-Operative | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Muniong Lodge | Muniong Ski Club Co-Op Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Munjarra Co-op Ski Club | Munjarra Co-operative Ski Club Ltd | 01/07/2014 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Narraburra Ski Club | Narraburra Ski Club Co-Op Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Oldina Ski Club | Oldina Ski Club Co-Operative Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Orana Ski Club | Orana Ski Club Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Parrawa Ski Lodge | Parrawa Ski Lodge Club Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – PB Guthega Quad Chairlift | Perisher Blue Pty Ltd | 01/09/2013 – 30/06/2048 | 30/06/2068 |
Kosciuszko NP | Comm. Lease – Peer Gynt Lodge | BJM Investment Holdings Pty Ltd | 01/07/2008 - 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Perisher Ambulance Station | Ambulance Service of NSW Southern Division | 07/01/1986 – 31/12/2025 | 31/12/2025 |
Kosciuszko NP | Comm. Lease – Perisher Carpark | Perisher Blue Pty Ltd | 01/07/1979 – 30/06/2048 | 30/06/2048 |
Kosciuszko NP | Comm. Lease – Perisher Creek Lodge | Perisher Creek Lodge Pty Ltd | 03/10/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Perisher Fire Brigade | Fire & Rescue NSW | 01/01/1984 – 31/12/2025 | 31/12/2025 |
Kosciuszko NP | Comm. Lease – Perisher Huette Limited | Perisher Huette Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Perisher Manor Hotel | Keenhold Pty Ltd | 01/07/1990 – 13/06/2030 | 13/06/2030 |
Kosciuszko NP | Comm. Lease – Perisher View Lodge | Geoanalysis Pty Ltd | 01/07/2014 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Redwood Ski Lodge | Redwood Ski Lodge Co-Operative Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – RMS Depot Wilsons Valley | Roads and Maritime Services | 01/07/2012 – 30/06/2037 | 30/06/2047 |
Kosciuszko NP | Comm. Lease – Rock Creek Ski Club | Rock Creek Ski Club Co-op Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Royal Coachman Ski Lodge | Valse Pty Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Rugby Lodge | Rugby Ski Club Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Salzburg Apartments | HD Diesels Pty Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Ski Rider Hotel | Ski Riders Motel (Kosciusko) Pty Ltd | 01/07/2009 – 31/12/2025 | 31/12/2025 |
Kosciuszko NP | Comm. Lease – Ski Sponars | Ski Sponars Pty Limited | 01/07/2009 - 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Smiggins Chalet Apartments | DJ & CR Pryke | 01/07/2008 - 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Smiggins Hotel | DJ & CR Pryke | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Smugglers Ski Club | Snow Culture Pty Limited | 09/04/2009 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Snow Country Ski Club | Snow Country Ski Club Co-Op Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Snow Revellers Club | Kosciusko Snow Revellers Club Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Snowgums Alpine Club | Snowgums Alpine Club Co-Op Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Snowy Gums Chalet | Snowy Gums Pty Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease - Snowy Park Lease | Snowy Hydro Limited | 28/06/2002 - 27/06/2077 | 27/06/2077 |
Kosciuszko NP | Comm. Lease – Sonnenhof Chalet | Haldell Pty Ltd | 01/07/2014 – 23/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – South Perisher Lodge | South Perisher Co-Op Alpine Club Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Southern Cross Ski Chalet | Anglican Youth Dept Diocese of Syd Ski Lodge Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Sundeck Hotel | Sundeck Hotel Pty Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Sundowner Ski Club | Sundowner Ski Club Co-Operative Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Sverre Kaaten Nordic Shelter | Ski & Snowboard Australia Limited | 01/07/2006 – 30/06/2031 | 30/06/2031 |
Kosciuszko NP | Comm. Lease – Swagman Chalet | John S Harvey and Silke E M Harvey T'tee for Pipeworks Investmt Trust | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Sydney Ski Club | Sydney Ski Club Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Tambaroora Ski Club | Tambaroora Ski Club Co-Op Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Tarrawonga Alpine Club | Tarrawonga Alpine Club Co-Op Ltd | 01/07/1995 – 31/12/2025 | 31/12/2025 |
Kosciuszko NP | Comm. Lease – Tate Ski Club | Tate Ski Club Co-Operative Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Technology Ski Club | Technology Ski Club Co-operative Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Telemark Ski Club | Telemark Ski Club Co-operative Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – The Chalets @ 1750 – Main Range Huts | Main Range Huts Pty Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – The RAN Ski Club | The RAN Ski Club | 01/07/2008 - 31/12/2028 | 31/12/2058 |
Kosciuszko NP | Comm. Lease – The Stables | The Stables Perisher Management Pty Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Thredbo Village Resort | Kosciuszko Thredbo Pty Ltd | 29/06/2007 – 28/06/2057 | 28/06/2057 |
Kosciuszko NP | Comm. Lease – Tiobunga Lodge | Brindabella Ski Club Inc Public Officer | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Trissana Ski Lodge | Trissana Ski Lodge Inc | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Turnak Ski Club | Turnak Co-operative Ski Club Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Ullr Ski Lodge | Ullr Ski Lodge Co-Op Society Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – University Alpine Club | University Alpine Club Limited | 01/07/1995 – 31/12/2025 | 31/12/2025 |
Kosciuszko NP | Comm. Lease – Valhalla Lodge | F J Precision (Holdings) Pty Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Waratah Ski Club | Waratah Ski Club Incorporated | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Warrugang Ski Club | Warrugang Ski Club Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Wild Spitze Ski Club | Wild Spitze Ski Club Inc | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Windarra Ski Lodge | Windarra Ski Lodge Co-operative Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Wirruna Lodge | Wirruna Lodge Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Yalara Lodge | Public Service Officers Ski Club Co Op Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Yaraandoo Ski Club | Yaraandoo Ski Club Co-Operative Limited | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Comm. Lease – Yeti Alpine Club | Yeti Alpine Ski Club Co-Operative Ltd | 01/07/2008 – 30/06/2028 | 30/06/2058 |
Kosciuszko NP | Easement – EA Electricity Easement | TransGrid | 01/07/2006 – Terminable at Will | |
Kosciuszko NP | Easement – EA Minor Facilities | Lake Crackenback Resort Management Pty Ltd | 01/07/2004 – 30/06/2030 | 30/06/2030 |
Kosciuszko NP | Easement – SL Khancoban Water Supply | Tumbarumba Shire Council | 01/07/1993 – Terminable at Will | |
Kosciuszko NP | Retail Lease – Snowline Ski Centre | Snowline Ski Centre (Kosciusko) Pty Ltd | 01/04/2009 – 31/12/2025 | 31/12/2025 |
Kosciuszko NP | Telco Access Lc – AC NBN Talbingo | National Broadband Network Co Ltd | 01/05/2018 – 30/04/2023 | 30/04/2038 |
Kosciuszko NP | Telco Cable Lic – CL Kosciuszko NP – Burning Log to Nordic Ctr | Perisher Blue Pty Ltd | 01/07/2013 – 30/06/2018 | Holdover |
Kosciuszko NP | Telco Cable Lic – CL Kosciuszko NP – Exchange to Mobile Phone Hut | Telstra Corporation Limited | 08/04/2013 – 07/04/2023 | 07/04/2033 |
Kosciuszko NP | Telco Cable Lic – CL Kosciuszko NP – Optic Fibre | Optus Fixed Infrastructure Pty Ltd | 01/05/2013 – 30/04/2018 | Holdover |
Kosciuszko NP | Telco Cable Lic – CL Kosciuszko NP - Thredbo & Creel Bay Cable | Telstra Corporation Limited | 01/09/2003 – 31/08/2023 | 31/08/2023 |
Kosciuszko NP | Telco Lic-CU – DPIE – NSW Police | NSW Police Force | 01/07/2012 – 30/06/2022 | 30/06/2032 |
Kosciuszko NP | Telco Lic-CU – DPIE Fire Tower – RMS | Roads and Maritime Services | 01/03/1992 – 30/06/2015 | Holdover |
Kosciuszko NP | Telco Lic-CU – DPIE VEC | The State of Victoria | 01/12/2011 – 30/11/2016 | Holdover |
Kosciuszko NP | Telco Lic-CU NSW Police | NSW Police Force | 01/03/2013 – 28/02/2018 | Holdover |
Kosciuszko NP | Telco Lic-CU Optus – Perisher | Optus Mobile Pty Limited | 01/07/2009 – 30/06/2023 | 30/06/2029 |
Kosciuszko NP | Telco Lic-CU Telstra | Snowy Hydro Limited | 01/01/2009 – 31/12/2029 | 31/12/2029 |
Kosciuszko NP | Telco Lic-CU Vodafone | Vodafone | 01/07/2009 – 30/06/2024 | 30/06/2029 |
Kosciuszko NP | Telco Lic-PU Telstra | Telstra Corporation Limited | 01/12/2010 – 30/11/2020 | 30/11/2020 |
Kosciuszko NP | Telco Lic-PU Telstra Tower Blue Cow | Telstra Corporation Limited | 01/10/2017 – 30/09/2022 | 30/09/2037 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Kuma NR | Easement – EL Kuma NR | Essential Energy DST Queanbeyan | 01/11/2010 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Ku-ring-gai Chase NP | Comm. Lease – Akuna Bay Marina | Denarke Pty Ltd att Martha Cove No 3 Vineyard Trust | 01/01/2011 – 31/12/2035 | 31/12/2050 |
Ku-ring-gai Chase NP | Comm. Lease – Bobbin Head Marina | Empire Marina Bobbin Head Pty Ltd | 16/06/2006 – 31/12/2020 | 30/06/2050 |
Ku-ring-gai Chase NP | Comm. Lease – Gibberagong Ed Env Centre | Gibberagong Environmental Education Centre | 23/05/2016 – 22/05/2026 | 31/05/2036 |
Ku-ring-gai Chase NP | Easement – EA Murrua Rd Sewerage | Sydney Water Corporation | 02/06/2008 – Terminable at Will | |
Ku-ring-gai Chase NP | Easement – EL Substation | Ausgrid | 11/11/2010 – Terminable at Will | |
Ku-ring-gai Chase NP | Easement – ROW Access | Private | 23/10/2009 – Terminable at Will | |
Ku-ring-gai Chase NP | Easement – SL King & Church Sts | Sydney Water Corporation | 08/04/1987 – Terminable at Will | |
Ku-ring-gai Chase NP | Easement – SL Myall Rd Pump Station | Sydney Water Corporation | 09/12/1976 – Terminable at Will | |
Ku-ring-gai Chase NP | Easement – TL McCarrs Creek/Elvina Bay | Ausgrid | 19/06/1986 – Terminable at Will | |
Ku-ring-gai Chase NP | Retail Lease – Bobbin Inn Terrace | Tae Man Kim & Mi Yeon Kim | 01/07/2010 – 31/12/2020 | Holdover |
Ku-ring-gai Chase NP | Retail Licence – Cottage Point Inn Restaurant | Astron Group Pty Ltd | 01/04/2019 – 31/03/2024 | 31/03/2029 |
Ku-ring-gai Chase NP | Telco Cable Lic – CL Akuna Bay – Telstra | Telstra Corporation Limited | 04/06/2007 – 03/06/2022 | 03/06/2027 |
Ku-ring-gai Chase NP | Telco Cable Lic – CL NBN Co Ltd | National Broadband Network Co Ltd | 01/05/2017 – 30/04/2022 | 30/04/2037 |
Ku-ring-gai Chase NP | Telco Lic-CU NSW Govt Telco – Cowan | NSW Govt Telco Authority | 01/11/2019 – 31/10/2024 | 31/10/2039 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Lake Innes NR | Easement – PL Kooloonung Creek | Port Macquarie Hastings Municipal Council | 14/07/1993 – Terminable at Will | |
Lake Innes NR | Easement – TL Kooloonbung Creek | Essential Energy DST Queanbeyan | 01/07/1994 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Lake Macquarie SCA | Comm. Lease – Wangi Point Caravan Park | Lake Macquarie City Council | 01/07/1997 – 30/06/2022 | 30/06/2022 |
Lake Macquarie SCA | Telco Cable Lic – CL Lake Macquarie SCA | National Broadband Network Co Ltd | 01/05/2018 – 30/04/2023 | 30/04/2038 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Lane Cove NP | Comm. Lease – Lane Cove River Tourist Park | Delaware North Lane Cove Pty Ltd | 01/04/2019 – 31/03/2029 | 31/03/2049 |
Lane Cove NP | Retail Lease – Jenkins Hall | S. Kim & P. Kim | 15/09/2017 – 14/09/2022 | 14/09/2027 |
Lane Cove NP | Telco Cable Lic – CL – NBN Lane Cove | National Broadband Network Co Ltd | 01/01/2019 – 31/12/2023 | 31/12/2038 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Leacock RP | Easement – EA ROW Leacocks Lane | Australian Rail Track Corp'n Ltd | 05/09/1997 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Limeburners Creek NP | Easement – SW Big Hill Flood Mitigation | Kempsey Shire Council | 17/07/1979 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Macquarie Marshes NR | Easement – EA Macquarie Marshes for Lot 3 | Waterman Agriculture Pty Ltd | 03/12/2008 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Macquarie NR | Comm. Lease – Koala Hospital | Koala Conservation Australia Inc | 01/12/2012 – 30/12/2017 | Holdover |
Macquarie NR | Easement – PLW Port Macquarie – Hasting Council | Port Macquarie Hastings Council | 16/02/1977 – Terminable at Will | |
Macquarie NR | Easement – TL Owen & Chalmers Sts | Essential Energy DST Queanbeyan | 15/07/1982 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Maroota HS | Telco Access Lc – AC Simpsons Hill | NSW Govt Telco Authority | 01/09/2019 – 31/08/2024 | 31/08/2039 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Marramarra NP | Resident. Lease – Canoelands Residence | Private | 01/06/2005 – 31/05/2021 | 31/05/2021 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Meroo NP | Telco Access Lc – AC Meroo NP | National Broadband Network Co Ltd | 01/09/2017 – 31/08/2022 | 31/08/2032 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Middle Brother NP | Telco Lic-CU – PU Transgrid | NSW Govt Telco Authority | 01/12/2019 – 30/11/2024 | 30/11/2039 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Montague Island NR | Comm. Lease – Lighthouse Building 1/788421 | Australian Maritime Safety Authority | 01/07/1997 – 30/06/2022 | 30/06/2047 |
Montague Island NR | Telco Lic-CU – DPIE – Surf Life Saving NSW | Surf Life Saving NSW | 01/07/2007 – 30/06/2017 | Holdover |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Mooball NP | Telco Lic-CU Essential Energy | Essential Energy | 01/01/2016 – 31/12/2020 | 31/12/2035 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Moonee Beach NR | Easement – EA Emerald Beach | Coffs Harbour City Council | 20/06/2006 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Morton NP | Easement – Burranga – Bendeela | TransGrid | 03/01/1991 – Terminable at Will | |
Morton NP | Easement – EA Crown & Woodburn Rds | Private | 04/08/2006 – Terminable at Will | |
Morton NP | Easement – EA Lot 100/DP1057717 | Private | 01/11/2005 – Terminable at Will | |
Morton NP | Easement – EA Lots 29 & 42/DP755937 | Private | 01/07/2012 – Terminable at Will | |
Morton NP | Easement – EA ROW Lyreyrie | Private | 01/11/2005 – Terminable at Will | |
Morton NP | Easement – EA ROW Off Tallowa Dam Rd | Private | 24/11/2010 – Terminable at Will | |
Morton NP | Telco Cable Lic – CL AARNET Morton NP Jerrawangala NP | AARTNET Pty Ltd | 01/02/2020 – 31/01/2025 | 31/01/2040 |
Morton NP | Telco Lic-CU Endeavour Energy | Endeavour Energy Property Services | 01/10/2016 – 30/09/2021 | 30/09/2036 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Mt Canobolas SCA | Telco Lease – PU Broadcast Australia TV | Broadcast Australia Pty Ltd | 01/07/2004 – 30/06/2024 | 30/06/2024 |
Mt Canobolas SCA | Telco Access Lc – AC Transgrid Fence | TransGrid | 01/04/2012 – 31/03/2017 | Holdover |
Mt Canobolas SCA | Telco Cable Lic – CL Mt Canobolas - Uground Optic Fibre | Optus Fixed Infrastructure Pty Ltd | 01/05/2010 – 30/04/2015 | Holdover |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Mullion Range SCA | Easement – PL Mullion Range | Orange City Council | 01/01/2015 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Mummel Gulf NP | Telco Lic-PU Essential Energy | Essential Energy DST Queanbeyan | 01/01/2011 – 31/12/2015 | Holdover |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Mundoonen NR | Easement – EA Mundoonen | TransGrid | 21/01/1986 – Terminable at Will | |
Mundoonen NR | Telco Access Lc – AC Mundoonen | NSW Govt Telco Authority | 01/12/2019 – 30/11/2024 | 30/11/2039 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Munmorah SCA | Easement – SL Catherine Hill | Hunter Water Corporation | 17/12/2010 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Murramarang NP | Comm. Lease – Murramarang Resort | Australian Tourist Park Management | 01/09/1986 – 31/08/2031 | 31/08/2031 |
Murramarang NP | Easement – Termeil and Bawley Pt | Epsiilon Distribution Ministerial Holding Corporation | 01/03/2020 – Terminable at Will | |
Murramarang NP | Telco Cable Lic – CL Murramarang NP – Durras Lake | Telstra Corporation Limited | 07/04/2008 – 06/04/2023 | 06/04/2028 |
Murramarang NP | Telco Lic-CU NBN Co Ltd | National Broadband Network Co Ltd | 01/07/2015 – 30/06/2020 | Holdover |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Murray Valley NP | Telco Cable Lic – CL Murray Valley RP – Barooga | National Broadband Network Co Ltd | 01/09/2018 – 31/08/2023 | 31/08/2038 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Myall Lakes NP | Comm. Lease – Lighthouse 1/847752 | Australian Maritime Safety Authority | 01/07/1997 – 30/06/2022 | 30/06/2047 |
Myall Lakes NP | Comm. Lease – Lighthouse Equipment Room & Workshop | Australian Maritime Safety Authority | 01/07/1997 – 30/06/2022 | 30/06/2047 |
Myall Lakes NP | Comm. Lease – Myall Shores Resort-Bombah Point | Australian Tourist Park Management | 02/12/2003 – 30/11/2031 | 30/11/2043 |
Myall Lakes NP | Comm. Lease – Sugarloaf Point Lighthouse | Seal Rocks Lighthouse Cottages Pty Ltd | 23/10/2018 – 22/10/2023 | 31/10/2028 |
Myall Lakes NP | Easement – EA Cabling | Essential Energy DST Queanbeyan | 16/11/2013 – Terminable at Will | |
Myall Lakes NP | Easement – EA Tomago-Taree Elec Line | TransGrid | 01/08/2006 – Terminable at Will | |
Myall Lakes NP | Easement – TL Cables-Seal Rock | Essential Energy DST Queanbeyan | 01/06/2011 – Terminable at Will | |
Myall Lakes NP | Telco Lic-CU NSW Govt Telco | NSW Govt Telco Authority | 01/12/2018 – 30/11/2023 | 30/11/2038 |
Myall Lakes NP | Telco Lic-CU NSW Govt Telco Authority | NSW Govt Telco Authority | 01/12/2018 – 30/11/2023 | 30/11/2038 |
Myall Lakes NP | Telco Lic-CU NSW Police | NSW Police Force | 14/03/2013 – 13/03/2018 | Holdover |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Non-Reserve | Resident. Lease – Cottage Tuggalong Road | Private | 01/03/2019 – 30/06/2021 | 30/06/2021 |
Non-Reserve | Retail Lease – Parc Cafe – SRVC | Parc Cafe Pty Ltd | 01/03/2016 – 28/02/2021 | 28/02/2021 |
Non-Reserve | Telco Lic-CU – DPIE Tower Off Park Bucketty | NSW Govt Telco Authority | 01/11/2019 – 31/10/2024 | 31/10/2039 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Parr SCA | Telco Lic-CU St Albans – Epsilon | Endeavour Energy Property Services | 01/01/2018 – 30/06/2022 | 30/06/2037 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Richmond Range NP | Telco Access Lc – AC Mt Babyl | Essential Energy DST Queanbeyan | 01/01/2014 – 31/12/2018 | Holdover |
Richmond Range NP | Telco Access Lc - AC NSW Telco Authority | NSW Govt Telco Authority | 01/03/2019 - 29/02/2024 | 28/02/2039 |
Richmond Range NP | Telco Access Lc – AC Telstra | Telstra Corporation Limited | 01/03/2018 – 28/02/2023 | 28/02/2038 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Roto House HS | Easement – PLW Water & Sewer Pipeline | Port Macquarie Hastings Council | 16/02/1977 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Royal NP | Comm. Lease – Anglican Church Rec & Conf | Anglican Church Property Trust Sydney | 01/10/2014 – 30/09/2034 | 30/09/2034 |
Royal NP | Comm. Lease – Audley Boatshed | Ronald, Denise, Geoffrey & Louis Hughes | 01/07/2004 – 30/10/2020 | Holdover |
Royal NP | Comm. Lease – Heathcote Fire Control Centre | Sutherland Shire Council | 01/01/1999 – 31/12/2023 | 31/12/2033 |
Royal NP | Easement – EA Anglican Church | Anglican Church Property Trust Sydney | 28/10/1994 – Terminable at Will | |
Royal NP | Easement – EL Bonnie Vale | Ausgrid | 26/02/2008 – Terminable at Will | |
Royal NP | Easement – EL Maianbar 11kV feeder | Ausgrid | 20/09/2011 – Terminable at Will | |
Royal NP | Easement – SL Sydney Water Corp | Sydney Water Corporation | 27/01/1983 – Terminable at Will | |
Royal NP | Retail Lease – Audley Dance Hall | Parks Foods Pty Ltd | 14/11/2016 – 13/11/2021 | 13/11/2026 |
Royal NP | Telco Cable Lic – NBN – Bundeena to Maianbar | National Broadband Network Co Ltd | 01/04/2018 - 31/03/2023 | 31/03/2038 |
Royal NP | Telco Lic-PU Telstra Grays Point | Telstra Corporation Limited | 01/07/2017 – 30/06/2022 | 30/06/2037 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Scheyville NP | Comm. Lease – RFS – Fire Shed | Hawkesbury City Council | 01/04/2015 – 31/03/2040 | 31/03/2050 |
Scheyville NP | Telco Cable Lic – CL Scheyville NP – Nr Longneck Lagoon | Dept of Education & Communities | 01/04/2011 – 31/03/2021 | 31/03/2031 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Sea Acres NP | Resident. Lease – Harmer's Residence | Private | 21/03/2007 – 20/03/2027 | 20/03/2027 |
Sea Acres NP | Retail Lease – Sea Acres Rainforest Cafe | Emily Nicol Scriven Aaron Luke Castell | 01/09/2005 – 30/06/2022 | 30/06/2022 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Sherwood NR | Telco Lic-CU NSW Govt Telco Authority | NSW Govt Telco Authority | 01/12/2018 – 30/11/2023 | 30/11/2038 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
South East Forest NP | Easement – PL Cooma to Bega | Essential Energy DST Queanbeyan | 01/11/2010 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
South Solitary Island HS | Comm. Lease – Sth Solitary Is Lighthouse | Australian Maritime Safety Authority | 01/07/1998 – 30/06/2023 | 30/06/2053 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Sturt NP | Easement – EA Ethane Pipeline | Gorodok Pty Ltd | 01/04/1995 – Terminable at Will | |
Sturt NP | Easement – EA Natural Gas Pipeline | East Australia Pipeline Pty Ltd | 01/07/1995 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Sugarloaf SCA | Telco Cable Lic – CL Sugarloaf Road | Optus Networks Pty Limited | 01/03/2016 – 28/02/2021 | 28/02/2021 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Sydney Harbour NP | Comm. Lease – Goat Island Shipyards | J & C McPherson & F.Field | 01/10/1998 – 08/05/2016 | Holdover |
Sydney Harbour NP | Comm. Lease – Nielsen Park Kiosk/Pavilion | Periptero Pty Limited | 01/07/2014 – 30/06/2021 | 30/06/2021 |
Sydney Harbour NP | Comm. Lease – Quarantine Station Conf Centre | Mawland Quarantine Station Pty Ltd | 26/10/2006 – 25/10/2027 | 31/07/2043 |
Sydney Harbour NP | Easement – EA Stormwater | Private | 20/06/1991 – Terminable at Will | |
Sydney Harbour NP | Easement – EA Stormwater 18 Carrara Rd | Private | 01/02/2007 – Terminable at Will | |
Sydney Harbour NP | Easement – SL Sydney Water | Sydney Water Corporation | 28/12/1986 – Terminable at Will | |
Sydney Harbour NP | Easement – TL Electricity – Lot 2763 DP752038 | Ausgrid | 13/04/2011 – Terminable at Will | |
Sydney Harbour NP | Easement – TransGrid Electricity Substation | TransGrid | 15/05/1961 – Terminable at Will | |
Sydney Harbour NP | Retail Lease – Athol Hall | Athol Hall Pty Ltd | 01/09/2017 – 30/06/2027 | 30/06/2037 |
Sydney Harbour NP | Telco Cable Lic – CL NBN Co Limited Cabling North Head Manly | National Broadband Network Co Ltd | 01/02/2020 – 31/01/2025 | 31/01/2040 |
Sydney Harbour NP | Telco Cable Lic – CL NBN Co Limited Cabling North Head Manly | National Broadband Network Co Ltd | 01/02/2020 – 31/01/2025 | 31/01/2040 |
Sydney Harbour NP | Telco Cable Lic – CL Telstra – HMAS Watson | Telstra Corporation Limited | 01/12/2018 – 30/11/2023 | 30/11/2038 |
Sydney Harbour NP | Telco Cable Lic – CL Telstra – HMAS Watson | Telstra Corporation Limited | 01/08/2016 - 31/07/2021 | 31/07/2036 |
Sydney Harbour NP | Telco Cable Lic – CL Telstra North Head – Blue Fish | Telstra Corporation Limited | 01/10/2017 - 30/09/2022 | 30/09/2037 |
Sydney Harbour NP | Telco Lic-PU NSW Police | NSW Police Force | 10/03/2006 – 09/03/2016 | Holdover |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Tabletop NR | Telco Access Lc – AC Mt Loka | Telstra Corporation Limited | 01/10/2010 – 30/09/2020 | 30/09/2020 |
Tabletop NR | Telco Cable Lic – CL Tabletop NR – Loka Trig | Optus Fixed Infrastructure Pty Ltd | 01/11/2010 – 31/10/2020 | 31/10/2020 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Tilligerry NR | Easement – EA Access Taylors Beach roadworks | Port Stephens Council | 01/10/2016 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Tilligerry SCA | Telco Cable Lic – CL Tilligerry SCA | Telstra Corporation Limited | 01/12/2015 – 30/11/2020 | 30/11/2020 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Tomaree NP | Easement – EA Sewer | Hunter Water Corporation | 30/07/1990 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Toonumbar NP | Easement – EA ROW Toonumbar | Rednecked Holdings Pty Ltd | 01/02/2011 – Terminable at Will | |
Toonumbar NP | Telco Lic-CU – PU DPIE Radio Network | NSW Govt Telco Authority | 01/01/2019 – 31/12/2023 | 31/12/2038 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Tweed Heads HS | Comm. Lease – Museum & Cultural Centre | Tweed Aboriginal Co-op Society Ltd | 01/09/2012 – 30/08/2037 | 30/08/2037 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Upper Nepean SCA | Telco Cable Lic – CL Bargo – Optus Cable 2 | Optus Fixed Infrastructure Pty Ltd | 09/09/2013 – 08/09/2018 | Holdover |
Upper Nepean SCA | Telco Cable Lic – CL NBN Co Ltd | National Broadband Network Co Ltd | 01/05/2017 – 30/04/2022 | 30/04/2037 |
Upper Nepean SCA | Telco Cable Lic – CL Upper Nepean River SCA – Avon Dam Rd to Nepean Dam | Telstra Corporation Limited | 01/10/2017 – 30/09/2022 | 30/09/2037 |
Upper Nepean SCA | Telco Cable Lic – CL Upper Nepean River SCA – Optus Cable 1 | Optus Fixed Infrastructure Pty Ltd | 01/07/2009 – 30/06/2019 | Holdover |
Upper Nepean SCA | Telco Cable Lic – CL Upper Nepean River SCA – Yanderra-Yerrinbool | Telstra Corporation Limited | 12/07/2010 – 11/07/2020 | Holdover |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Wallumatta NR | Easement – SW Cressy Rd North Ryde | City of Ryde | 01/02/1993 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Warrumbungle NP | Easement – EA Siding Spring Observ Pipeline | Australian National University | 01/08/2005 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Werakata NP | Telco Access Lc – AC Telstra | Telstra Corporation Limited | 01/07/2017 – 30/06/2022 | 30/06/2037 |
Werakata NP | Telco Cable Lic – CL Werakata | Optus Fixed Infrastructure Pty Ltd | 01/08/2018 – 31/07/2023 | 31/07/2038 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Wereboldera SCA | Telco Lic-CU Vertical Telecoms Pty Ltd | Vertical Telecoms Pty Ltd | 01/12/2015 – 30/11/2020 | 30/11/2020 |
Wereboldera SCA | Telco Lic-PU Transgrid | TransGrid | 01/11/2012 – 31/10/2017 | Holdover |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Whian Whian SCA | Easement – PLW Rous Country Council | Rous County Council | 28/02/2018 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Willi Willi NP | Telco Cable Lic – Willi Willi & Boonanghi NR | Telstra Corporation Limited | 01/07/2014 – 30/06/2019 | Holdover |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
William Howe RP | Easement – PLG Subterranean Pipeline | AGL Energy Ltd | 01/09/2009 – Terminable at Will | |
William Howe RP | Easement – SL Spring Farm Water Supply | Sydney Water Corporation | 19/06/2008 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Wogamia NR | Easement – EA ROW Longreach Rd | Private | 05/04/2005 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Woko NP | Telco Lic-CU – PU DPIE Radio Network – CU NSWTA | NSW Govt Telco Authority | 01/08/2019 – 31/07/2024 | 31/07/2039 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Wollemi NP | Comm. Lease – Wolgan Valley Resort | Emirates Hotels Pty Limited | 11/09/2009 – 10/09/2030 | 10/09/2030 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Woomargama NP | Easement – EA ROW Tin Mines Rd | The Trust Company (PTAL) Ltd atf ANZFIF 2 Sub 1 | 25/02/2008 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Worimi RP | Easement – SL Fern Bay Wastewater Scheme | Hunter Water Corporation | 21/02/2006 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Wyrrabalong NP | Easement – PLW Harbour Street Upgrade | Central Coast Council | 21/07/2018 – Terminable at Will |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Yabbra NP | Telco Lic-PU Telstra | Telstra Corporation Limited | 01/05/2011 – 30/04/2021 | 30/04/2031 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Yarriabini NP | Telco Lic-PU – CL Optus Cable | Optus Fixed Infrastructure Pty Ltd | 01/07/2012 – 30/06/2017 | Holdover |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Yengo NP | Telco Lic-CU Govt Telco Auth Telstra Tower | NSW Govt Telco Authority | 01/01/2010 – 30/06/2022 | 30/06/2027 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Yurammie SCA | Telco Cable Lic – CL Yurammie SCA – Optic Fibre | Telstra Corporation Limited | 01/01/2006 – 31/12/2020 | 31/12/2020 |
Location | Purpose and Description | Lessee/Licensee Name | Contract Start - End Date | Latest End Date (includes Option to Renew) |
---|---|---|---|---|
Yuraygir NP | Easement – PL Ulmarra Council | Clarence Valley Council | 06/03/1990 – Terminable at Will | |
Yuraygir NP | Easement – SL Sewerage | Clarence Valley Council | 01/01/1994 – Terminable at Will |